Concrete Stamps for the Okanagan Rail Trail

The Okanagan Rail Trail stretches from the north end of the valley to the south and takes a few side trails along the way. The new rest buildings along the trail needed some branding and we were pleased to provide the stamps that were set in the building’s forms before the concrete was poured. For this job we used 18 pound HDU and carved out these stamps. A few test pieces were made prior to the final stamps to ensure the angles on the sides of the letters and objects would release cleanly from the stamps when the forms were pulled. They turned out perfect (well almost) when the big reveal happened.